Plastering for listed and heritage buildings
Traditional lime plastering for listed and historic buildings in Cheshire and Manchester: lath, three-coat work, hand-formed details and removal of inappropriate cement render.
A listed or historic building needs its plasterwork repaired in materials and methods that suit it, and often within listed building consent. The work is slower than modern plastering, and much of it is preparation that is hidden once the job is finished.
What the work looks like
- Removing the wrong materials. On a Grade II listed property in Langley, Macclesfield, the job began with taking off sand and cement render, which traps moisture in an old structure, so the building could breathe again.
- Sound bases. Traditional laths were fixed to internal timber frames, with broken sections replaced, and wood wool boards used where air could not circulate. See lathing.
- Three-coat lime. In a Grade II listed interior in Crewe, stripped back to bare brick, walls were finished with scratch, float and fine coats, a slower process than modern plaster that is breathable and sits well in a heritage setting. Where less depth was needed in Langley, two coats were enough.
- Hand-formed detail. In Crewe new timber splints were set into the brickwork for the dowels, one dowel was steamed and bent by hand to follow an arched reveal, and each was trimmed with a piece of zinc afterwards to form crisp arris lines.
- Modern materials where they help. In a Grade II listed building on Deansgate, Manchester, stainless steel rib lath, hemp lime plaster, a superfine putty plaster from Ty Mawr and stainless steel angle beads were used together.
Training
Training includes the Level 3 course in heritage plastering at the Tywi Centre in Llandeilo, covering lime mortars, lime on lath and decorative work; there is an account of it in the blog.
Before you start
Listed building work needs the right consent from the local authority before it begins. The consent, and any conditions on it, are for the owner to hold; the plasterwork is then built to follow them.